The success of a pilot project should be evaluated through measurable indicators rather than subjective impressions.
Examples of engineering metrics include:
- percentage improvement in water availability
- reduction in irrigation demand
- reduction in deep percolation
- improvement in moisture uniformity
- sensor availability
- communication uptime
- prediction accuracy
- system reliability
The selection of metrics should always reflect the specific objectives established before the pilot begins.