RAD-TECH-0001 Pilot Validation

117. Validation Metrics

The success of a pilot project should be evaluated through measurable indicators rather than subjective impressions.

Examples of engineering metrics include:

  • percentage improvement in water availability
  • reduction in irrigation demand
  • reduction in deep percolation
  • improvement in moisture uniformity
  • sensor availability
  • communication uptime
  • prediction accuracy
  • system reliability

The selection of metrics should always reflect the specific objectives established before the pilot begins.